<< Click to Display Table of Contents >>
Configuring a De-Energized Trigger |
1.Change the model of Substation SUB03 by inserting a Breaker called "LINE" between Transformer TR01 and Generator GEN01, a Breaker called "5202" between Transformer TR01 and Breaker 5201 and a Bar between Breakers 5202 and 5201, according to the next figure.
Model of Substation SUB03
2.Insert the device SUB03.5202 on spreadsheet Device_List to receive the following values:
•Column EnableTriggerDeEnergizing: S
•Column BreakersDownDeEnergizing: 5201
3.Insert the points of Breaker 5202 on spreadsheet SUB03 and copy the points of Breaker 5201.
4.Perform a new application load process.
5.To perform a de-energizing test, select device SUB03.Line in the Change Variables option and simulate an opening. This allows the Terminal of device SUB03.5202 to be de-energized and the current zeroed. Then, execute the command Self-healing: Release trigger handling by de-energizing a bar.