Configuring a Priority Load

<< Click to Display Table of Contents >>

 

Configuring a Priority Load

1.Insert in the electrical model of Feeder FE02, downstream of device RL03, a Distribution Transformer called "DT01" and configure the SelfHealingPriority property with value 1 (one).

Transformer DT01

Transformer DT01

2.Insert in the electrical model of Feeder FE03, downstream of device RL06, a Distribution Transformer called "DT02" and configure the SelfHealingPriority property with value 2 (two).

Transformer DT02

Transformer DT02

 

NOTE

There is no need to insert these same objects in Feeders Simulate_FE02 and Simulate_FE03.

 

3.Update the diagram SchematicOperation in the Electrical Modeler.

Diagram SchematicOperation

Diagram SchematicOperation

4.Update the operation Screen of Elipse Power.

5.Execute tests validating that priority is respected during recomposition.

Was this page useful?