PowerEngine and Electrical Studies

<< Click to Display Table of Contents >>

 

PowerEngine and Electrical Studies

Improved the algorithm of the Self-Healing Electrical Study that establishes the system status before a trigger. The new property StabilizationInterval created in the Electrical Study allows a fine tuning on system dynamics regarding the de-syncing of field devices' clocks.

Created the TriggerAnalysisTimeout property in the Self-Healing Electrical Study, which allows configuring the module so that the analysis of a trigger is aborted in case it lasts longer than the maximum configured time.

Added a new trigger to the Self-Healing Electrical Study, which allows restoring networks when detecting they are de-energized.

Was this page useful?