Logic on IEDs, PLCs, and Concentrators

<< Click to Display Table of Contents >>

 

Logic on IEDs, PLCs, and Concentrators

Field devices must be configured to receive preset signals and also to handle events received via GOOSE messages of the 61850 protocol.

This logic must be configured in each one of these Breakers eligible to work with Load Shedding.

Load Shedding logic on IEDs

Load Shedding logic on IEDs

Was this page useful?