LoadSheddingSwitchEvents

<< Click to Display Table of Contents >>

 

LoadSheddingSwitchEvents

This type of event is used when users want to configure the loss of a generator source, and this loss is going to isolate the Generator. This configuration allows the Load Shedding Module to simulate what is going to happen with the system when this Switch opens, even if in the field the way the system checks if the Generator is out of operation is not effectively opening this Switch.

In addition, this event can be used to define a Scenario with a inter-bar Switch being opened or closed.

The algorithm executes a simulation of what is going to happen in the system if this Switch is opened or closed and calculates if there is a need to shut down any Load and select these Loads, always based on the amount of Load that are not going to be available.

The following properties must be configured:

Equipment: Receives the path of the Breaker or Switch used to detect the event

Trigger: Position of the Breaker or Switch used to trigger the event

Was this page useful?