<< Click to Display Table of Contents >>
Historic |
1.Right-click the Database item and insert a new Historic in E3Training project, naming it as "HistLevel".
Option to add a Historic to a project
2.In this Historic, insert two new Fields and configure them according to the next figure.
Historic Fields
3.Open the Properties Window of this Historic and, on the Historic tab, configure the following properties:
•Database Server: Database
•Table name: Level
•Interval between records (ms): 2000
4.Click Create Table. The message on the next figure must appear.
Success message